How to enter suppliers and inbound transport, utilities, production sites and their allocation, production waste and packaging for the product stage A1–A3 in the EPD Generator.

4. A1–A3 inputs

The product stage (A1–A3) contains the raw materials (A1), the transport to the factory (A2) and the manufacturing (A3). The tool calculates A1 from the bill of materials (BoM) of step 3. This page tells you how to enter A2 and A3.

Use primary data of a 12-month period for all A3 inputs. Use the same period for all of them. The data period of the EPD is set on the EPD tab (P-39).

Suppliers and inbound transport (A2)

For each own part that you buy:

  1. Open the part, and then the Supply chain tab.
  2. Add each supplier with its name, address and country. (P-10)
  3. If the part has more than one supplier, enter the share of each supplier, 0–100 %. (P-11)
  4. Add the transport route from each supplier. Enter one or more legs. Give each leg a transport mode from the library and a distance in km. (P-12)

If you enter no shares, the tool splits the part equally between its suppliers. If you enter a share for one supplier, the suppliers without a share count as 0 %.

CAUTION: The tool does not check that the supplier shares total 100 %. Examine the total before you continue.

A part with no route has no inbound transport. Enter a route for each bought part.

Utilities and energy per product (A3)

Use this when you measure the energy or water of the product directly.

  1. Open the assembly, and then the Production tab.
  2. Under Utilities, add each utility from the library. Enter the amount per unit of product. The amount is more than 0. (P-13)

You can also enter utilities per unit of an own part, on the Production tab of the part.

For the electricity, use the library utility that matches the country of the production site.

Production sites and allocation (A3)

Use this when you know the utility totals of a site, not of one product.

  1. Open Locations and make a location for each production site. Enter the name, the address and the country. (P-14)
  2. On the Allocations tab, add the products and parts made at the site. Enter the annual volume of each. (P-15)
  3. Under Allocate by, select Volume, Weight or Price. (P-16)
  4. On the Utilities tab, enter the utility totals of the site for the 12-month period. (P-17)
  5. If a part of the site has its own meters, make a sub-process on the Sub-processes tab. Give it its utilities, its products and its allocation basis.

The tool divides the site totals between the products by the allocation basis. A product with no annual volume, or a volume of 0, gets no share of the site totals. Keep the evidence for the allocation basis.

If one product is made at several sites, the location impact rule of your organisation applies: weighted average or sequential. (P-19) See 8. Multi-product and multi-site EPDs.

Production waste (A3)

  1. On the Production waste tab of the location, add each waste stream of the site. Enter its amount for the period. (P-18)
  2. Enter the treatment route shares. The routes without a module D credit total 100 %.
  3. On the Transport to gate tab, enter the transport of the waste and the transport between your sites. (P-20)

CAUTION: You select the data sets of a waste stream from the background database. These data sets are not part of the tool version, and the sealing check does not cover them. Select data sets of the system model that the tool version uses. Write down the reason for each data set.

Packaging (A1–A3)

  1. On the Production tab of the assembly, under Packaging, add each packaging item from the library. (P-21)
  2. Enter the quantity per unit of product. The quantity is more than 0.
  3. For an own part that arrives with packaging, add the packaging on the part.

The packaging mass of the product goes into the transport to the building site (A4) and into the packaging waste of installation (A5). The packaging on a part goes into the inbound transport mass of that part. The tool calculates no waste treatment for it.

Next step

Go to 5. A4 and A5.