Dawn
Tutorials/EPD Generator

3. Product model

How to model a window or door in the EPD Generator with library parts: the bill of materials, quantities, production loss, variants, and the mass and material composition of your own parts.

3. Product model

In the tool, the declared product is an assembly. An assembly has a bill of materials (BoM) of parts and sub-assemblies. Each part is a library part or one of your own standard parts. Your own parts are made of library materials.

The model has three levels:

  1. Library materials carry the generic data set, the end-of-life scenario and the module D values.
  2. Your own parts (components) have a mass per unit and a material composition of library materials.
  3. The assembly has the BoM: parts and sub-assemblies with their quantities.

Own parts: mass and material composition

Make an own part for each component that you buy or make. Examples are a frame profile, a glass pane or a hinge.

  1. Open Parts and make a new standard part. Give it a name and a unit.
  2. Enter the mass per unit of the part in kg. Use weighing records, drawings or supplier data sheets. (P-07)
  3. On the material table, add each material from the library. Enter its share by mass in Allocation (%). (P-08)
  4. Make sure that the shares total 100 %. The part page does not save another total.
  5. Optionally, enter the origin of each material. The origin goes into the EPD text only. It does not change the results. (P-09)

CAUTION: The tool has no range check on the mass. A part with no mass gives no material impact, no transport and no end of life. Examine the mass of each part against the drawing.

Do not link a data set or an LCA to your own standard part. The tool blocks the seal of an EPD when a standard part has its own data set or linked LCA.

Assembly: bill of materials and quantities

  1. Open Products and make a new assembly for the declared product. Give it a name.
  2. On the BOM tab, select Search and add. Add each part or sub-assembly.
  3. Enter the Quantity of each line in the unit of the part. The quantity is more than 0. (P-02, P-03)
  4. Compare the total mass of the assembly with the mass of the real product.

You model one produced item of the assembly. The tool converts the results of the EPD to the declared unit of your organisation: 1 item, 1 m² or 1 kg. Settings › EPD tool shows the declared unit.

  • 1 item. No conversion.
  • 1 m². On the Info tab, open the Dimensions card. Enter the width and the height of the product in metres (P-57). The tool divides the results by width × height. The variants of an assembly use the same width and height. Enter the size of the product that you model. The tool does not set a standard size.
  • 1 kg. The tool divides the results by the mass of the product from the BoM.

"Submit for review" is not available while the width, the height or the mass that the declared unit needs is missing.

NOTE: If your organisation has the EN 17213 feature: EN 17213:2020+A1:2025 §6.3.3 requires a declared unit of 1 m² and asks for a standard size. State the size that you used in the product description of the EPD.

Production loss

Production loss is the material lost in manufacturing (A3). The tool applies the production-loss model of your tool version. You cannot change the model.

  1. Open the Production tab, and then Production loss.
  2. For each BoM line, enter the Loss %: 0–100 %. Use scrap or yield records of 12 months. (P-04)
  3. If the lost material goes to a waste processor, enter the Transport to waste.

The lost material adds its production (A1–A3), the transport of the scrap and its waste processing. The library material gives the end-of-life scenario of the scrap.

Variants

A variant is a version of the product with lines left out, added or changed. (P-05)

  1. On the BOM tab, select New variant.
  2. Give the variant a name.
  3. Change, add or remove the lines that differ. Quantity and loss follow the same limits as the base product.

All other inputs (utilities, packaging, transport, use stage and end of life) are the same for all variants. To declare several variants in one EPD, see 8. Multi-product and multi-site EPDs.

Next step

Go to 4. A1–A3 inputs.

Subscribe to our newsletter